PROJECT
The construction of a part single and part two storey 50 bed Acute Mental Health Unit of approx. 4,508m² over a single level basement incorporating 142 parking bays, together with associated site works, and a dedicated power substation. Structural frame consisted of insitu / steel beams and blockwork supporting 200mm Ducon Prestressed Hollowcore Slabs and Ducon Precast Concrete Stairs.